CM KP Solar Scheme Registration Process
CM KP Solar Scheme Registration Process Launched, New Hope for Minorities Under the CM KP Solar Scheme Registration Process, the Khyber Pakhtunkhwa government has introduced a wonderful scheme to provide free solar systems for places of worship of minorities. This scheme aims to ensure the continuous supply of electricity to minorities and facilitate their religious affairs. The registration process for this scheme has been kept very simple and transparent, so that maximum deserving people can benefit from it.

Applicants for registration can use two methods: online and offline. For online registration, you have to visit the website of Pakhtunkhwa Energy Development Organization (PEDO) and fill in a specific form. All the necessary documents such as identity card, minority status confirmation, and details of the place of worship must be provided. For offline registration, get the form from the Deputy Commissioner’s office, complete it, and submit it along with the necessary documents.
This scheme not only makes minorities self-sufficient in electricity supply but also helps in reducing their problems. This government initiative is an important step towards sustainable energy and social justice, which can benefit even people from remote areas. Complete your registration as soon as possible to take advantage of this golden opportunity.
Also Read: Complete Details of BISP Payments 2025: Registration, Eligibility, and Payment Process
Online Registration Process for CM KP Solar Scheme
The online registration for the CM KP Solar Scheme offers a quick and convenient way for applicants to enroll. Here is how you can apply:
- Visit the Official Website
- Go to the Pakhtunkhwa Energy Development Organization (PEDO) website at https://pedokp.gov.pk/.
- Navigate to the “Free Solar” section or directly access http://freesolar.pedokp.gov.pk/.
- Fill Out the Application Form
- Enter accurate details such as CNIC, contact information, and specifics about the worship place.
- Double-check the information to avoid errors.
- Upload Required Documents
- Attach scanned copies of necessary documents, including proof of residence, minority status verification, and worship place details.
- Submit the Form
- Review your form for accuracy and submit it. A confirmation message or follow-up details will be provided regarding the next steps.
This seamless online process ensures maximum accessibility for tech-savvy applicants.
Offline Registration Process for CM KP Solar Scheme
For those without internet access, the offline registration option ensures no one is left behind. Here is how to register offline:
- Collect the Application Form
- Visit your district’s Deputy Commissioner’s office to collect the Solar Scheme application form.
- Fill in the Details
- Carefully fill out the form with essential details like CNIC, worship place specifics, and contact number.
- Ensure your handwriting is clear and legible.
- Attach Necessary Documents
- Include photocopies of required documents, such as proof of identity, minority status verification, and location details.
- Submit the Application
- Submit the completed form and attached documents to the Deputy Commissioner’s office.
- Retain the receipt provided for tracking your application.
This offline process is equally efficient, ensuring inclusivity for individuals in remote or underserved areas.
Also Read: Complete Guide to BISP 13500 Online Registration Beneficiaries and Verification Process
Eligibility Criteria for CM KP Solar Scheme
To qualify for the scheme, applicants must meet these requirements:
- The applicant must represent a recognized minority worship place.
- Proof of minority status and location verification is mandatory.
- Worship places in remote or underserved areas will be given priority.
Ensuring the program’s benefits reach those in need is a key focus of the eligibility criteria.
Benefits of the CM KP Solar Scheme
Registering for the CM KP Solar Scheme brings numerous advantages:
- Uninterrupted Energy Access
- Solar-powered systems provide consistent energy for religious practices, eliminating the challenges posed by power outages.
- Sustainability
- Encourages the use of renewable energy, reducing dependency on traditional energy sources.
- Inclusivity
- Focuses on minority communities, promoting equal access to resources and opportunities.
- Ease of Registration
- The program’s dual registration options ensure everyone can apply without difficulty.
Also Read: Benazir Income Support Programme 2025 New Updates Regarding Payments and Registration
Conclusion
The CM KP Solar Scheme represents a progressive step by the Khyber Pakhtunkhwa government toward energy sustainability and inclusivity. By offering both online and offline registration methods, the scheme ensures that eligible minority worship places can benefit from uninterrupted solar energy.
If you or your community falls under the eligibility criteria, don’t miss the opportunity to apply. Gather the required documents and complete your registration to secure a brighter and more sustainable future for your worship place. This initiative is more than just a solar scheme; it’s a testament to the government’s dedication to uplifting and supporting all communities in the province.
Also Read: Benazir Kafaalat Phase 1 New Installment 2025 (13500 Payment)